From CAD development and automated cutting to stitching, lasting, direct injection and laboratory review, every stage has a defined job in the finished product.
A SAFETY SHOE IS ONLY AS STRONG AS THE PROCESS BEHIND IT.
01 / Manufacturing flow
FROM DEVELOPMENT TO FINAL REVIEW.
The process is presented in sequence so buyers can understand where design intent, batch consistency and quality checks enter the program.
01 / Development
CAD & pattern work
Product direction, upper structure and construction details are translated into production-ready information.
02 / Cutting
Material preparation
Automated and controlled cutting prepares upper components for repeatable assembly.
03 / Stitching
Upper assembly
Upper components, reinforcements and brand details are assembled into the planned construction.
04 / Lasting
Shape & fit formation
The upper is formed on the last and prepared for sole construction and finishing.
05 / Sole forming
Direct injection
The selected sole construction is formed around the prepared upper under controlled production conditions.
06 / Review
Laboratory & final checks
Product review closes the loop before shipment and repeat-order planning.
02 / Factory view
THE FACILITY. THE WORK BEHIND THE PRODUCT.
A short exterior and production introduction from the manufacturing base.
03 / Buyer review points
ASK FOR THE RIGHT EVIDENCE.
Review the selected model, approved material set, required documentation, sample status, packaging definition and final batch criteria as one connected program.